Romania · Market profile · status November 2026

Romania: does a promotional campaign need a permit?

No permit, but the rules must be notarised before the start and a copy filed with the ministry. There is no ONJN opinion procedure for advertising draws.

23out of 100
Rated: manageable
Permit10/30
Lead time0/20
Guarantees and fees0/25
Levies on prizes5/20
Mechanic restriction0/15
Formalities15/20

Planning effort, not legal risk, and not legal advice. Before every launch the mechanic is confirmed by a law firm admitted in the market.

In detail

Purchase-tied prize draw

Promotional campaigns (campanie promoțională); outside gambling law as long as no entry fee and no spending beyond the normal product price is required

Permit / registration

The rules must be notarised before the start and a copy filed with the ministry; there is no ONJN opinion procedure for advertising draws

Prize taxation

10 % withholding tax on the part of each prize above 600 lei, remitted by the organiser

Watch out

If the mechanic requires a real stake it is gambling under a different act and needs a full licence, not an opinion

What this means for your campaign

Allow time for the notary and the filing before launch. The organiser withholds 10 % tax on the part of each prize above 600 lei. Keep entry free of any charge beyond the normal product price: a real stake makes the campaign gambling under a different act, with a full licence.

Other market profiles

Austria · Belgium · Bulgaria · Croatia · Czechia · Denmark · Estonia · Finland · France · Germany · Hungary · Ireland · Italy · Latvia · Lithuania · Malta · Netherlands · Norway · Poland · Portugal · Serbia · Slovakia · Slovenia · Spain · Sweden · Switzerland · United Kingdom

All 44 markets side by side

The market rules overview scores all 44 markets on the same six components, shows the legal detail for each and adds up the effort for your market selection.

Planning a campaign in Romania?

Tell us the mechanic, the markets and the date. You get a fixed-price concept back within three business days, including the permit route per market.